← Prev ID EFTA00728707Dataset 9Next ID EFTA00728709 →

EFTA00728708

Dataset 9 · 1 page · 415 KB · 188 words

Same document on epstein-data.com (opens in a new tab)
Cite this document

EFTA00728708, U.S. Department of Justice, Epstein Files release (Dataset 9). Primary source: https://www.justice.gov/epstein/files/DataSet%209/EFTA00728708.pdf. Retrieved via Epstein Files Transparency Act Resources, https://tommycarstensen.com/epstein/data/documents/set9/00728/EFTA00728708.html.

Extracted Images (1) #

Page 1 of EFTA00728708
Page 1 # source

People (1) #

Extracted Text #

This text was extracted automatically from the scanned pages and may contain errors. Check any quotation against the original scan above or the source document.

Epstein Residence New Generator Budget for Construction 1/20/2009 Generator Work Budget Amount Supervision & General Conditions S 3,500 Worth Builders Proj. Mgmt. Fee 1,000 Structural Engineering & Geotechnical Work 2,200 Electrical Engineering & Architects Work 4,000 Electrical Work, Equipment & Machinery 68,000 Garage Floor/Driveway Cutting & Repairs 3,000 Generator Foundation & Mounting Slab 3,200 Screen Walls (if needed) MC Removal & Replacement of Landscaping NIC Contingency for unknowns 3,000 Plumbing Work for New Gas Line 3,500 Subtotal 91.400 Permits 2,742 Contractor's Overhead and Profit @10% 11,297 General Liability Insurance @1% 1.054 Budget Total $ 106,493 Notes: 1. Owner is responsible for ARCOM Approval costs, if not a staff approval 2. Owner is responsible for meter costs, if gas meter needs to be upgraded in size 3 Screen walls around the generator on 3 sides may be required by Code Local architect to determine this & help with ARCOM approvals 4. This is a Time and Material Budget--Cost plus 10%+1% This not a Guaranteed Maximum Contract Proposal. 5. Energy Efficient Electric Proposal is attached for your information & review. 'd Lipeag wted sJapting q4Jom e9b:L.0 CO SI 4414 EFTA00728708
← Prev ID EFTA00728707Dataset 9Next ID EFTA00728709 →