← Prev ID EFTA00577661Dataset 9Next ID EFTA00577703 →

EFTA00577702

Dataset 9 · 1 page · 49 KB · 202 words

Same document on epstein-data.com (opens in a new tab)
Cite this document

EFTA00577702, U.S. Department of Justice, Epstein Files release (Dataset 9). Primary source: https://www.justice.gov/epstein/files/DataSet%209/EFTA00577702.pdf. Retrieved via Epstein Files Transparency Act Resources, https://tommycarstensen.com/epstein/data/documents/set9/00577/EFTA00577702.html.

Extracted Images (1) #

Page 1 of EFTA00577702
Page 1 # source

People (2) #

Extracted Text #

This text was extracted automatically from the scanned pages and may contain errors. Check any quotation against the original scan above or the source document.

MEMO 6/15/01 TO: Ms. Maxwell FROM: Regarding: Frank Steele status report 6/13/01 and meeting minutes 6/14/01 I briefly spoke to Frank this morning however he is on vacation and did not have access to his files. He will return Monday and I will receive further details. 1) LSJ BOAT DOCK Frank stated he was authorized to continue with the planning and administration only. He was instructed to research permitting for an additional 20' in length and adding an "L" 25 to 30' long. I requested an itemized list of the items he has purchased on our behalf to begin construction on the dock. He will complete this list next week. 2) 2) PB WINDOW REPAIR/REPLACEMENT Frank stated he recommended that we repair the rotted window frames as opposed to replacing them. 3) GARBAGE ENCLOSURE I asked Frank to confirm that the trash haulers would collect the trash from the new enclosure prior to commencing with construction. He will research and advise. 4) DRAINAGE The City of PB required provisions for surface drainage of the staff house area. We are required to install a drain line from the structure to the road which will require the disruption of sections of the driveway. EFTA00577702
← Prev ID EFTA00577661Dataset 9Next ID EFTA00577703 →