EFTA00521485
Invoice or billing statement (read from the document's own text: how)
Dataset 9 · 2 pages · 78 KB · 402 words
Bates numbers EFTA00521485 to EFTA00521486 are the 2 pages of this one document, not separate documents.
Cite this document
EFTA00521485, U.S. Department of Justice, Epstein Files release (Dataset 9). Primary source: https://www.justice.gov/epstein/files/DataSet%209/EFTA00521485.pdf. Retrieved via Epstein Files Transparency Act Resources, https://tommycarstensen.com/epstein/data/documents/set9/00521/EFTA00521485.html.
Extracted Images (2) #
Extracted Text #
This text was extracted automatically from the scanned pages and may contain errors. Check any quotation against the original scan above or the source document.
Prime Renovations & Painting 11 Cora Court Hampton Bays New York 11946 Estimate U.S.A # EST-1176 (917)287-2878 (631)680-2238 Bill To Mervin Dela Cruz 9 East 71 St New York Estimate Date : 10/25/18 10021 New York Item & Description Jt 1 SCOPE OF WORK: 1.00 5,000.00 5,000.00 Site protection protect all work areas using masonite boards protect any walls as needed with plastic covers protect bedroom floors and walls during the duration of the work 2 Plumbing 1.00 9,500.00 9,500.00 Prier demolition 1. shut down water to the steam shower, toilet room and sink remove all plumbing fixture 2. remove toilet water line as well as waste line 3. relocate water lines including steam head outlet relocate controllers 3 Demolition: 1.00 11,500.00 11,500.00 1. Remove 3 brass doors leading into the steam room, shower & toilet MOM Steam Shower 2. completely demo by removing all the stone and cement boards from the ceiling, walls, floors and benches 3. completely remove wall between toilet room and steam shower to expand steam room Toilet Room 4. completely demo by removing all stone and drywall boards from ceiling, walls and floor Sink area 5. completely demo sink wall by removing all stone and drywall boards and framing Cart away all debris 4 1.00 37,000.00 37,000.00EFTA00521485 · end of page 1 of 2Finish Work 1. frame new bench in stem shower 2. install 5/8 cement boards to the ceilings, walls and bench 3. completely waterproof steam shower ceilings, walls and floor 4. install new tile to the ceiling, walls, bench and floor 5. grout tiles 5 Electrical 1.00 3,800.00 3,800.00 supply and install new exhaust fan exhaust steam into shower install switch for exhaust fan to turn on when exiting the steam room install new lighting in steam room 6 GLASS 1.00 8,500.00 8,500.00 supply and install new glass panels with shower door to the new steam shower instal new glass door to walk•in shower 7 PAINT 1.00 6,500.00 6,500.00 completely paint ceiling and walls that are not getting tiles 8 Cleaning 1.00 2,000.00 2,000.00 thoroughly clean all the work areas and remove all tools and any other debris left Sub Total 83,800.00 Total $83,800.00 Notes All tiles and any other fixtures are to be provided by client Terms & Conditions Looking forward to your business Estimate valid for 30 days 5096 deposit required to begin work Contractor: Prime Renovations & Painting (signature) Date: Client: Mervin Dela Cruz (signature) Date:EFTA00521486 · end of page 2 of 2