← Prev ID EFTA00521481Dataset 9Next ID EFTA00521485 →

EFTA00521482

Invoice or billing statement (read from the document's own text: how)

Dataset 9 · 3 pages · 94 KB · 481 words

Bates numbers EFTA00521482 to EFTA00521484 are the 3 pages of this one document, not separate documents.

Same document on epstein-data.com (opens in a new tab)
Cite this document

EFTA00521482, U.S. Department of Justice, Epstein Files release (Dataset 9). Primary source: https://www.justice.gov/epstein/files/DataSet%209/EFTA00521482.pdf. Retrieved via Epstein Files Transparency Act Resources, https://tommycarstensen.com/epstein/data/documents/set9/00521/EFTA00521482.html.

Extracted Images (3) #

Page 1 of EFTA00521482
Page 1 # source
Page 2 of EFTA00521482
Page 2 # source
Page 3 of EFTA00521482
Page 3 # source

Extracted Text #

This text was extracted automatically from the scanned pages and may contain errors. Check any quotation against the original scan above or the source document.

Prime Renovations & Painting 12 Cora Court Hampton Bays New York 11946 Estimate U.S.A # EST-1172 (917)287-2878 (631)680-2238 Bill To Mervin Dela Cruz 9 East 71 St New York Estimate Date : 10/10/18 10021 New York :JUG. Qt, Rate Amount 1 SCOPE OF WORK: 1.00 5,000.00 5,000.00 Site protection protect all work areas using masonite boards protect any walls as needed with plastic covers protect bedroom floors and walls during the duration of the work 2 Plumbing 1.00 9,500.00 9,500.00 Prier demolition 1. shut down water to the steam shower, toilet room, walk•in shower & sink remove all pluming fixture trim remove toilet, sink vanity temporary cap all water lines and drains during the duration of work After all finish work has been completed 2. reinstall all trim fixtures, toiletsink and vanity 3 Demolition: 1.00 24,000.00 24,000.00 1. Remove 3 brass doors leading into the steam room, shower & toilet room after completion of the work to be reinstalled Steam Shower 2. completely demo by removing all the stone and cement boards from the ceiling, walls, floors and benches Walk•in shower 3. completely demo by removing all stone and cement boards from ceiling, walls, and floor Toilet Room 4. completely demo by removing all stone and drywall boards from ceiling, walls and floor Sink area 5. completely demo by removing all stone and drywall boards from ceiling, walls and floor Cart away all debris 4 Finish Work: 1.00 42,000.00 42,000.00EFTA00521482 · end of page 1 of 3Steam Shower 1. apply 5/8 cement boards to the ceiling, walls and bench 2. apply Laticrete 9235 with membrane waterproofing to the ceiling, walls, floors and bench 3. apply tiles to tile to the ceiling, walls and bench 4. finish grouting tiles Walk•in Shower 1. apply 5/8 cement boards to the ceiling, walls 2. apply Laticrete 9235 with membrane waterproofing to the ceiling, walls and floor 3. apply tiles to tile to the ceiling, walls and floor 4. finish grouting tiles Toilet Room 1. apply 5/8 drywall boards to the ceiling, walls 2. apply Laticrete 9235 with membrane waterproofing to the walls and floors 3. apply tiles to the ceiling, walls and floor 4. finish grouting tiles Sink Area 1. apply 5/8 drywall boards to the ceiling, walls 2. apply Laticrete 9235 with membrane waterproofing to the walls and floor 3. apply tiles to the walls and floor 4. finish grouting tiles 5 PAINT 1.00 6,500.00 6,500.00 completely paint ceiling and walls that are not getting tiles 6 Cleaning 1.00 2,000.00 2,000.00 thoroughly clean all the work areas and remove all tools and any other debris left Sub Total 89,000.00 Total $89,000.00 Notes All tiles and any other fixtures are to be provided by client Terms & ConditionsEFTA00521483 · end of page 2 of 3Looking forward to your business Estimate valid for 30 days 50% deposit required to begin work Contractor: Prime Renovations & Painting (signature) Date: Client: Mervin Dela Cruz (signature) Date: 3EFTA00521484 · end of page 3 of 3
← Prev ID EFTA00521481Dataset 9Next ID EFTA00521485 →