EFTA02498267
Dataset 11 · 1 page · 54 KB · 174 words
Cite this document
EFTA02498267, U.S. Department of Justice, Epstein Files release (Dataset 11). Primary source: https://www.justice.gov/epstein/files/DataSet%2011/EFTA02498267.pdf. Retrieved via Epstein Files Transparency Act Resources, https://tommycarstensen.com/epstein/data/documents/set11/02498/EFTA02498267.html.
Extracted Images (1) #
People (4) #
Extracted Text #
This text was extracted automatically from the scanned pages and may contain errors. Check any quotation against the original scan above or the source document.
From: Daphne Wallace Sent: Friday, June 19, 2015 1:44 PM To: Jeffrey Epstein Cc: ann rodriquez; Rich Kahn Subject: Barge return - June 19, 2015 Greetings Sir, The realistic date for t=e return of Big N is Friday, July 31. We spoke wi=h Gene this morning (Gene spoke with Boscoe last night) who summarized for=us the parts to be completed before the barge is ready for sea trials: Old engines removed and stored Engine parts=swapped from old engines to new ones New engines set in pl=ce (old engines loaded for return) Alignment Exhaust s=stem Wiring to the new engines Recondition the transmi=sion Replace the fuel lines Recondition the fuel=filters Sea trials Gene does not forese= any catastrophic setbacks, but at this time he also does not see the comp=etion before the end of July. When we speak with =oyson on Monday, I will request their barge for the mobilization of Better=Roads equipment, and that they work with us as auxiliary until Big N's=return, so this project's schedule is not derailed. Respectfully, Daphne EFTA_R1_01623579 EFTA02498267