← Prev ID EFTA02488881Dataset 11Next ID EFTA02488883 →

EFTA02488882

Dataset 11 · 1 page · 53 KB · 172 words

Same document on epstein-data.com (opens in a new tab)
Cite this document

EFTA02488882, U.S. Department of Justice, Epstein Files release (Dataset 11). Primary source: https://www.justice.gov/epstein/files/DataSet%2011/EFTA02488882.pdf. Retrieved via Epstein Files Transparency Act Resources, https://tommycarstensen.com/epstein/data/documents/set11/02488/EFTA02488882.html.

Extracted Images (1) #

Page 1 of EFTA02488882
Page 1 # source

People (4) #

Extracted Text #

This text was extracted automatically from the scanned pages and may contain errors. Check any quotation against the original scan above or the source document.

From: Daphne Wallace < Sent: Wednesday, September 9, 2015 4:13 PM To: Jeffrey Epstein Cc: ann rodriquez; Rich Kahn Subject: Boyson schedule - September 9, 2015 Greetings Sir, Anna and I just received=a phone call from Boyson. The parts they are waiting on to repair th=ir second engine will not be available until next week. As a result, they can only transport lighter loads. Anna=has prioritized getting the trash, gravel, sand, topsoil and waste oil rem=val completed as soon as possible. Boyson cannot =arry the weight of the crusher run volume that is needed to complete the R=ad project, nor the asphalt, until both engines are back online. To make matters worse, they are scheduled to put the =arge into drydock beginning 9/18 for approximately 10 days. =/div> We will concentrate on maximizing the crucial loads needed to ke=p the present projects going and prepare for your return, and next week si= with Mr. Jeffers and Big Sam to create a new Road Schedule for your revie=. Respectfully, Daphne 1 EFTA_R1_01609128 EFTA02488882
← Prev ID EFTA02488881Dataset 11Next ID EFTA02488883 →