EFTA01828680
Email: Conduit Bank Approval (read from the document's own text: how)
Dataset 10 · 2 pages · 100 KB · 271 words
Bates numbers EFTA01828680 to EFTA01828681 are the 2 pages of this one document, not separate documents.
Cite this document
EFTA01828680, U.S. Department of Justice, Epstein Files release (Dataset 10). Primary source: https://www.justice.gov/epstein/files/DataSet%2010/EFTA01828680.pdf. Retrieved via Epstein Files Transparency Act Resources, https://tommycarstensen.com/epstein/data/documents/set10/01828/EFTA01828680.html.
Extracted Images (2) #
People (3) #
Extracted Text #
This text was extracted automatically from the scanned pages and may contain errors. Check any quotation against the original scan above or the source document.
To: Doug Schoettle From: Jeffrey Epstein Sent: Wed 6/17/2009 6:59:38 PM Subject: Re: FW: Conduit Bank Approval. ok On Wcd, Jun 17, 2009 at 2:47 PM, Doug Schoenlc <= > wrote: Jeffrey, I recommend that the electrical and technology conduit bank that was installed under the concrete plant be extended to the new electrical building at this time. A trench is being dug for the extension of the under sea power cable to the electrical building, now is the time to install the extra conduit in the same trench. Regards, Doug --- On Wed, 6/17/09, Brice Gordon < > wrote: From: Brice Gordon <n> Subject: FW: Conduit Bank A royal. To: "Doug Schoettle" < > Date: Wednesday, June 17, 2009, 3:19 PM Doug, FYI Brice Forwarded Message From: J Epstein <jeevacation@gmail.com> Date: Wed, 17 Jun 2009 13:56:32 -0400 To: Brice Gordon < Subject: Re: Conduit Bank Approval. this is a doug issue On Wed, Jun 17, 2009 at 2:04 PM, Brice Gordon < > wrote: To: JEE Attached is a proposal for a 2soft extension of the 10 Pipe Conduit bank to the new Electrical building. After reviewing with Tom and Doug , I would like to submit the above proposal for your review/approval The first leg was installed (early 2006) prior to cement plant installation Tom is now trenching for the new electrical supply to mechanical building. Proposed 10 pipe Conduit bank is for the future build out of the existing compound and if this work is not performed at this time we are effectively abandoning existing Conduit bank. EFTA_R1_00204196EFTA01828680 · end of page 1 of 2Amount: $21,610.00 F3rICe End of Forwarded Message EFTA_R1_00204197EFTA01828681 · end of page 2 of 2