← Prev ID EFTA01005656Dataset 9Next ID EFTA01005659 →

EFTA01005657

Email: LSJ Cabana Floor Damage (read from the document's own text: how)

Dataset 9 · 2 pages · 75 KB · 348 words

Bates numbers EFTA01005657 to EFTA01005658 are the 2 pages of this one document, not separate documents.

Same document on epstein-data.com (opens in a new tab)
Cite this document

EFTA01005657, U.S. Department of Justice, Epstein Files release (Dataset 9). Primary source: https://www.justice.gov/epstein/files/DataSet%209/EFTA01005657.pdf. Retrieved via Epstein Files Transparency Act Resources, https://tommycarstensen.com/epstein/data/documents/set9/01005/EFTA01005657.html.

Extracted Images (2) #

Page 1 of EFTA01005657
Page 1 # source
Page 2 of EFTA01005657
Page 2 # source

People (1) #

Extracted Text #

This text was extracted automatically from the scanned pages and may contain errors. Check any quotation against the original scan above or the source document.

From: "Jeffrey E." <jeevacation@gmail.com> To: Brice Gordon Subject: Re: LSJ Cabana Floor Damage Date: Thu, 19 Jul 2018 18:13:50 +0000 talk later ? no ceiling we can have standing On Thu, Jul 19, 2018 at 2:00 PM, Brice Gordon < > wrote: Afternoon Attached photo's of moisture damage to the Wood Floors in Cabana's I & 2 Chilax storage I noticed a patch of moisture on the newly Trolled Wall in Cabana I late yesterday afternoon Today we will empty all cabana's and remove paper from floors Both Cabana's I and 2 are showing signs of moisture damage on the prevailing wind sides. Cabana 4 still needs to be emptied. It appears the moisture is coming from the masonry exterior walls and bleeding thin Also the electrical conduit lines are Condensating. All door opening that have be abandoned are water tight This afternoon we will move all the beds, bed frames, cabinets and place into the Chilax Room for storage. The condensate line for the AC has been repaired. New protective paper and tarps will be laid in all Cabana's Dehumidifiers and Floor Fans will be placed in each space Recommendations: Reinstall ceiling fans Once the Painters Finish with treating the Dock Deck wood, they will seal the exterior Stone/Masonary walls on the Cabana's Finish Thresholds and Install Interior Doors Finish removal of Sills and Masonry Work Repaint all interior walls in Cabana's Repair and Refinish all Cabana Floors, Master Bedroom, Pool Cabana Install and finishing of new wood floor. Brice Gordon The Saint James Group USVI Ph: please note The information contained in this communication is confidential, may be attorney-client privileged, may constitute inside information, and is intended only for the use of the addressee. It is the property of JEE Unauthorized use, disclosure or copying of this communication or any part thereof is strictly prohibitedEFTA01005657 · end of page 1 of 2and may be unlawful. If you have received this communication in error, please notify us immediately by return e-mail or by e-mail to jeevacation@gmail.com, and destroy this communication and all copies thereof, including all attachments. copyright -all rights reservedEFTA01005658 · end of page 2 of 2
← Prev ID EFTA01005656Dataset 9Next ID EFTA01005659 →