EFTA00577705
Dataset 9 · 1 page · 34 KB · 186 words
Cite this document
EFTA00577705, U.S. Department of Justice, Epstein Files release (Dataset 9). Primary source: https://www.justice.gov/epstein/files/DataSet%209/EFTA00577705.pdf. Retrieved via Epstein Files Transparency Act Resources, https://tommycarstensen.com/epstein/data/documents/set9/00577/EFTA00577705.html.
Extracted Images (1) #
Extracted Text #
This text was extracted automatically from the scanned pages and may contain errors. Check any quotation against the original scan above or the source document.
GM REPORT 71ST 1. Remco require 4 days to re polish the marble floor and I am waiting for you to tell me when that would be best 2. You need to decide what material you would like to redo the back passage floors in so that I can get a sample and you can approve it 3. Th back passage needs repainting. I have received a quote for $3000. When would you like to shcdule this andoishould pick a colour. 4. When the work is finished at 65th is coming to the hse to fix the ceiling in the MBR 5. The ceiling above the door the walls and ceiling in the exercise room also need re plaster and then re painting. I have not shown the additional work to the painters yet for a quote. 6. The door closer was put on today. I will have Rich adjust the strength of it Mon 7. The carpet from the MBR bath was picked up and will be ready approx 8. The Dome 9. The curtains and need to be taken down and cleaned. 10. EFTA00577705