← Prev ID EFTA00547147Dataset 9Next ID EFTA00547150 →

EFTA00547148

Email, 11 Jun 2012 (read from the document's own text: how)

Dataset 9 · 2 pages · 71 KB · 345 words

Bates numbers EFTA00547148 to EFTA00547149 are the 2 pages of this one document, not separate documents.

Same document on epstein-data.com (opens in a new tab)
Cite this document

EFTA00547148, U.S. Department of Justice, Epstein Files release (Dataset 9). Primary source: https://www.justice.gov/epstein/files/DataSet%209/EFTA00547148.pdf. Retrieved via Epstein Files Transparency Act Resources, https://tommycarstensen.com/epstein/data/documents/set9/00547/EFTA00547148.html.

Extracted Images (2) #

Page 1 of EFTA00547148
Page 1 # source
Page 2 of EFTA00547148
Page 2 # source

Extracted Text #

This text was extracted automatically from the scanned pages and may contain errors. Check any quotation against the original scan above or the source document.

From: To: Subject: Re: Date: Mon, 11 Jun 2012 14:12:17 +0000 Can you pls let me know if the medicine cabinet will be able to be recessed in the wall, or if it will need to be wall mounted. I believe Karyna just wants a med cabinet large enough to go over the sink. Also wanted to make sure the overhead lights are on dimmers? Do we need to buy the light switch for the wall with a dimmer? On Jun 11, 2012, at 2:59 PM, wrote: > Ok thanks Original Message > From: Mnew email > To: Penn baluyut > Cc: Anthony barett > Subject: Re: > Sent: Jun 11, 2012 8:44 AM > She wants them horizontal in a straight line. Thanks > On Jun 11, 2012, at 1:01 PM, wrote: >> Please verify from Karyna or let me know the tile layout today. Thanks Original Message » From: new email • >> To: Penn baluyut >> Cc: Anthony barett >> Subject: Re: >> Sent: Jun 11, 2012 6:43 AM >> Great! Thanks. Will you install the tiles in a straight line, or brick pattern? Did Karyna specify this as well? >> On Jun 11, 2012, at 12:04 PM, wrote: >>> Karyna told us to install the tiles horizontal. I will take pictures today. Demolition is done. Dropped ceiling is done and ready for electrical. All plumbing roughing for shower body and check valves are done. We will start the shower floor today and will install tiles tomorrow. >>> Message >» From: new email ■ >» To: Penn baluyut >» To: Anthony barett >» Subject: >>> Sent: Jun 11, 2012 1:58 AM >» >>> Good morning. Just checking in on 8H bathroom. Would someone be able to send me a few snapshots? Also, how is the tile being installed? What direction, pattern? No one ever asked me which way it should go..did Karyna tell you what she wanted? >» >>> Sent from my Verizon Wireless BlackBerryEFTA00547148 · end of page 1 of 2>> Sent from my Verizon Wireless BlackBerry > > Sent from my Verizon Wireless BlackBerryEFTA00547149 · end of page 2 of 2
← Prev ID EFTA00547147Dataset 9Next ID EFTA00547150 →