← Prev ID EFTA00522058Dataset 9Next ID EFTA00522062 →

EFTA00522060

Dataset 9 · 2 pages · 102 KB · 544 words

Bates numbers EFTA00522060 to EFTA00522061 are the 2 pages of this one document, not separate documents.

Same document on epstein-data.com (opens in a new tab)
Cite this document

EFTA00522060, U.S. Department of Justice, Epstein Files release (Dataset 9). Primary source: https://www.justice.gov/epstein/files/DataSet%209/EFTA00522060.pdf. Retrieved via Epstein Files Transparency Act Resources, https://tommycarstensen.com/epstein/data/documents/set9/00522/EFTA00522060.html.

Extracted Images (2) #

Page 1 of EFTA00522060
Page 1 # source
Page 2 of EFTA00522060
Page 2 # source

Extracted Text #

This text was extracted automatically from the scanned pages and may contain errors. Check any quotation against the original scan above or the source document.

Punch List — May 23. 2012 1. Five Palms — TOP PRIORITY - Laying conduit and pulling cable — begins 5/26 - - Exterior Door Shutters — PO rejected by JE, on hold awaiting design - Interior Doors — Install 5/25/12 - Painting — final outside & inside coats to be completed — 5/30 and 5/31 - Furniture — Sofa — leather samples/pictures forwarded — Sarah - Desk - on site - Rug — on site, cleaning scheduled for 5/30 - Lights— Parrots finished, awaiting approval on down lights - Mirrored siding — Panels ordered/Sarah Glue here Tues - tapestry Molding for Ceiling — bid rejected, need to review design with JE - Transformer building — Building 5/31, 5/25 — final electrical hookup 6/8 — temporarily powered by generator - Flooring — installation 5/23 to 5/26 - Fire pit — gas and grate installation 5/30 2. Grotto - - Genset wiring — scheduling to be determined 3. Berm —4 large planter boxes with small planter inside require construction — size to be determined by JE - cleanup and excavate — 5/26 - hydroseed — 5/29 - remove rock screener - 5/25 4. Engineering/Maintenance Yard - Steel Shed — foundation in progress -Metal Sheets on old building 5. Triangle - landscaping 6. Flagpole Pool Cabana - - Recovering of sofa/chairs — work in progress - Furniture - review another piece of furniture — Sarah 7. Entry Tree Lights— lights on site — installation complete 6/1 8. Solutions for Generators — Sound proofing solution forwarded to JE, require direction , wall built 9. Tiki - shields with the vendor in Wewak (5/4) — working on the permit to export — will take 1 to 2 weeks 10. Dock — - Decking — replace all damaged boards and carpet — 5/31 - Floating Dock— 5/31. Ramp by 5/29 - Jet ski Docking - review - Table/Dock Box —Bill starting 5/29 11. Kite House — review of wooden outside furniture - Sarah 12. Chillax Room — requires furniture piece for electrical/media equipment — Sarah 13. Chilax Bathroom - requires blue rugs for bathroom & vanity area — Sarah 14. Mechanical Building - Replacement Transformer — approved to purchase — ordered 15. Boats - Midnight Express — Offshore repairing fiberglass, once complete will begin engine and steering install - PRD— sell — Craig to discuss with JE - Lady G — sellEFTA00522060 · end of page 1 of 2- Big N - sell - Calypso — refurbish — Craig to discuss with JE - Little C — Offshore has received block — power heads expected 6/6, then awaiting balance of parts 16. Gym Road - road grading after Five Palms — 6/1 17. Outside Master Bedroom — bedroom door adjusted — awaiting lock 18. Timers — review installing timers on air conditioners, irrigation water systems, and lights 19. Life vests — new life vests, yellow and black, in men's and women's sizes — at least 2 of each, if not 4 in unisex size so they can be exchanged - Sarah 20. Beach lighting — per JE, replace existing transformers for the beach lighting of palms around the salt pond and beach 21. Pergolas — construct 3 pergolas for benches at the top of the hill — start 5/29 23- Main entrance/ gravel/gradeEFTA00522061 · end of page 2 of 2