← Prev ID EFTA02027231Dataset 10Next ID EFTA02027233 →

EFTA02027232

Email: Gil update (read from the document's own text: how)

Dataset 10 · 1 page · 54 KB · 166 words

Same document on epstein-data.com (opens in a new tab)
Cite this document

EFTA02027232, U.S. Department of Justice, Epstein Files release (Dataset 10). Primary source: https://www.justice.gov/epstein/files/DataSet%2010/EFTA02027232.pdf. Retrieved via Epstein Files Transparency Act Resources, https://tommycarstensen.com/epstein/data/documents/set10/02027/EFTA02027232.html.

Extracted Images (1) #

Page 1 of EFTA02027232
Page 1 # source

Extracted Text #

This text was extracted automatically from the scanned pages and may contain errors. Check any quotation against the original scan above or the source document.

To: jeevacation@gmail.com[jeevacation@gmail.com]; jeevacation mail.com 'eevacation@gmail.com] From: Sent: Wed 3/2/2011 9:22:12 PM Subject: Gil update Jeffrey, Gulfstream is planning to work APU and boost pump on second shift today at 3pm, Quality Control is researching and hopes to approve the T-Stat install that I brought with on plane, the paper work that came with the Tstat is 1970 build date, three other Tstat's are listed in parts data base system, but are not ready to ship since they are waiting bench testing,. There is also a pressure test of pneumatic system for Tstat, Gulfstream is checking to see if this break out box is on hand in Long Beach,. -Boost pump issue's will be addressed by Avionics tonight,. suspect corrosion on canon plug in wheel well, and filter down stream of pump,. are area's we are looking, in addition to Circuit Breaker integrality, 50amp,. If you approve of below floor inspection in Long Beach, Gulfstream can start Thursday,. I will keep you posted, thanks, Larry EFTA_R1_00535467 EFTA02027232
← Prev ID EFTA02027231Dataset 10Next ID EFTA02027233 →