← Prev ID EFTA02007872Dataset 10Next ID EFTA02007876 →

EFTA02007874

Dataset 10 · 2 pages · 125 KB · 422 words

Bates numbers EFTA02007874 to EFTA02007875 are the 2 pages of this one document, not separate documents.

Same document on epstein-data.com (opens in a new tab)
Cite this document

EFTA02007874, U.S. Department of Justice, Epstein Files release (Dataset 10). Primary source: https://www.justice.gov/epstein/files/DataSet%2010/EFTA02007874.pdf. Retrieved via Epstein Files Transparency Act Resources, https://tommycarstensen.com/epstein/data/documents/set10/02007/EFTA02007874.html.

Extracted Images (2) #

Page 1 of EFTA02007874
Page 1 # source
Page 2 of EFTA02007874
Page 2 # source

Extracted Text #

This text was extracted automatically from the scanned pages and may contain errors. Check any quotation against the original scan above or the source document.

VIRGIN ISLAND GUNITE POOLS St. Thomas — U.S. Virgin Islands Date: Jan. 24, 2011 PROPOSAL Proposal submitted to: Work to be performed at: Name: L.S.J., L.L.0 Street: Little St. James City: State; Zip: Phone: E-mail: We hereby propose to furnish the following materials, equipment and perform the labor necessary fur the completion of: 1.) 1— 21 x 75 Rectangle Gunite Pool — 4' —10' Depth 2.) 6" Waterline tile of L.S.J Choice 3.) 16" x 24" x 2" Thick Pool Coping — L.S.J. Choice of Coping 4.) Caretaker In-Floor Cleaning System 5.) 3 — LED Pool Lights 6.) 2 Sets of Steps in Pool 7.) 2 Benches in Deep End of Pool fif wanted) 8.) 2 — Pentair Variable Speed Pumps 9.) 2 — Pentair Cartridge Filters 10.) 2 — Heat Pumps 11.) 2 — Pentair IntelliChlor Chlorine Generators 12.) 1 — Auto Water Leveler 13.) Diamond Brite Interior Pool Finish 14.) Plumb Pool with all schedule 80 pipe L.S.J., L.L.C. is to furnish equipment and operator to excavate the pool and to supply all gunite materials as per specifications. Virgin Island Gunite Pools to oversee new excavation and furnish all rebar, plumbing and gunite plans. Virgin Island Gunite Pools to have pool plumbed, steeled and gunited within 4 weeks of excavation. All material is guaranteed to be as specified and the above work to be performed in accordance with the drawings and specifications submitted for above work and completed in a substantial workmanlike manner for the sum of: 5200,000.00 - Two hundred thousand dollars With payments to be made av follows: Progressive payments as per agreed upon 40,000.00 Deposit upon move in of jobsite S 40,000.00 Due upon completion of steel 40,000.00 Due upon completion of gunite 40,000.00 Due upon completion of tile and coping $ 40,000.00 Balance due upon startup and use Any alteration or deviation from *hose specifications ins oh ing extra costs Will be executed only upon Written orders and pill become an extra charge over and abose the estimate. All agreements contingent upon strikes. accidents. or delays beyond our control. Customer to carry fire, tornado, and all other necessary Insurance upon slime nark. Respectfully Submitted: EFTA_R1_00507957EFTA02007874 · end of page 1 of 2Per: Kart Wolterman Note: This proposal may be withdrawn by us if not accepted within 30 days. ACCEPTANCE OF PROPOSAL The above prices, specifications and conditions are satisfactory and are hereby accepted. You are hereby authorized to do the work as specified. Payment will be made as outlined above. Date: Signature: L.L.C. Date: Signature: Virgin Island Gunite Pools EFTA_R1_00507958EFTA02007875 · end of page 2 of 2
← Prev ID EFTA02007872Dataset 10Next ID EFTA02007876 →